AISC Member & Quality Certified for Steel Building Structures, 
Advanced Steel Bridges, and Hydraulic Steel Structures with 
Fracture Critical and Sophisticated Paint Endorsements

AISC logo

Route 9W Bridge over Cedar Pond Brook

Three span plate Girder Bridge of weathering steel with painted fascias. NYSDOT purchased the steel directly prior to the general construction to accelerate steel delivery.

Location:  Rockland County, NY

Completed:  Summer 2009

Owner:  New York State

Architect:  New York State Department of Transportation

Engineer:  New York State Department of Transportation

General Contractor:  Harrison & Burrowes

  • Route 9W Bridge over Cedar Pond Brook
  • Image 2   IMG 4220
  • Image 3   Small
  • Image 4   0951 9W 2
  • Image 5   0951 9W 3
  • Image 6   0951 9W 1
  • Image 7   Str. Steel3 006large
  • Route 9W Bridge over Cedar Pond Brook
  • Image 2   IMG 4220
  • Image 3   Small
  • Image 4   0951 9W 2
  • Image 5   0951 9W 3
  • Image 6   0951 9W 1
  • Image 7   Str. Steel3 006large